Data Elements: CaseStudies.aspx

HVAC

University of Utah

After installing the VTX-11 couplings, the University reported that they no longer had to change seals and bearings out every six months.

Fort Wainwright

The Army decided to install MagnaDrive VTX couplings to not only solve their vibration issues, but also hoped to save energy by allowing the VTX couplings to slip.

Grand Hyatt Hotel

The Grand Hyatt decided to install MagnaDrive’s 10.5 ASDs in order to regulate water pressure and flow so that it could be tailored to occupancy levels and guest demand