Data Elements: CaseStudies.aspx

Water & Wastewater

City of Eugene

MagnaDrive proposed the installation of a MGD 18/250 coupling to replace the entire belt system. The proposal was accepted and the coupling installed.

DC Water & Sewer Authority

DC Water not only achieved the speed control they required, but were also able to remove the $80,000-per-month rental pumps.

Fairfax County Water

After the ASD was installed, the pump station’s efficiency increased by over 50%.